Electrical Installations — UST Corporate Offices
Electrical Installations / Execution
Client: UST
Location: Andares, Guadalajara, Mexico
Year: 2024
Scope: Electrical installation / Execution
Project Description
Electrical installation project for corporate offices located in the Andares Corporate Building, including lighting, power outlets, air conditioning supply, main distribution, and UVIE verification.
What was done
- Office lighting installation
- Electrical outlets installation
- Power supply for air conditioning systems
- Main electrical distribution
- Electrical diagrams and load schedules
- UVIE verification
- Installation of a 112.5 kVA transformer
Result
Project completed in compliance with current regulations, ensuring safe and efficient operation.